|
Project Risk Analysis 2.1 Use Monte Carlo Simulation to determine the risk of a project being overspent and the contingency needed to achieve the desired level of
| | ! - M8 Multi Clipboard for Windows 4.20 The M8 multi clipboard captures everything that you cut or copy from any program, text or graphics. It holds up to 300,000 clips, has a
| | APSW Instant Converter 1.0 A universal conversion program that converts units from time, length, area, volume and much more. Even comes with a breeding chart most
| |