|
Project Risk Analysis 2.1 Use Monte Carlo Simulation to determine the risk of a project being overspent and the contingency needed to achieve the desired level of
| | BodyTrans 2.1.0 BodyTrans tracks your training, nutrition, and mindset for overall fitness. Features include a nutrition guide, nutrition log
| | IVOS - Intelligent Voice Operating System 2.0.2.A IVOS (Intelligent Voice Operating System) is an intelligent agent that offers both Speech Recognition and Text-to-Speech capabilities
| |