SW Cost Estimation Program 1.3.1.1 Implements COCOMO 81 algorithms, with extensions, to generate software project effort, cost, and schedule estimates based on estimated
| MIDICLOCK 1.04 MIDICLOCK can be used for synchronization of MIDI devices.
The BPM rate of the clock signal can be set, and the MIDI real time clock
pro
|