|
Project Risk Analysis 2.1 Use Monte Carlo Simulation to determine the risk of a project being overspent and the contingency needed to achieve the desired level of
| | 3D Ground Zero 1 3D Ground Zero challenges you to protect a city from asteroid impacts and enemy attacks. As enemies appear on the radar screen, you must
| | 3D Hard Core 1 Hard Core challenges you to seize and destroy the world's most out of control supercomputer. With 50 levels of enemy filled mazes
| |