|
Project Risk Analysis 2.1 Use Monte Carlo Simulation to determine the risk of a project being overspent and the contingency needed to achieve the desired level of
| | TNT Screen Capture 2.10 TNT Screen Capture - the best capture tool available. TNT has all the goodies and helpful functions you have been missing with other screen
| | BrainStorm 3.5.2 BrainStorm enables high-speed thinking, planning and organizing. You can capture, store, modify and rearrange ideas and other info in a
| |