|
Materials Requirements Planning (MS Access XP) 2.17 Planning of materials for production based on inventory, BOMs, purchase orders and production/sales forecasts. It can be used as a tool
| | Ten Thousand Dice 2.40 Ten Thousand Dice - A Game of Temptation and Chance for up to 6
The game is played with six dice, and is a race to score at least
| | 3D Green Power Screensaver 1.0.0. This 3D Clock Features are: Specially designed 3D atmosphere, Unique sound environment, 3D animations, Adjustable 3D settings, Cameras
| |