|
Project Risk Analysis 2.1 Use Monte Carlo Simulation to determine the risk of a project being overspent and the contingency needed to achieve the desired level of
| | Americalculator 9.0 Calculator with a scrollable tape, options to save or print all calculations, optional large screen display. Calculates dates and times
| | Cine Module 3.50 The Cinematography module covers all major film formats from 8mm to 70mm. The data for 16 fixed focal length or zoom lenses using T or f
| |